“test report older than 12 months” — what to check before you pay for a retest

A phrase sellers search for after a compliance document is rejected. This guide walks through the checks that usually matter, the two figures that are easy to confuse, and the mistakes that lead to a second rejection. It does not tell you what your case means.

1. What this wording usually points to

When a marketplace rejects a document because a test report is “too old”, the underlying issue is generally one of two things: the issue date of the report falls outside the validity window the marketplace applies to that category, or the standard edition cited in the report is no longer the current one. These are different problems with different remedies, and they are often bundled together in a short automated message.

A third possibility is worth ruling out early: the report may be perfectly valid, but attached to the wrong case, the wrong parent ASIN, or submitted while a previous review is still open. In that situation a new report changes nothing.

2. Six things to check first

3. The 12-month and 180-day figures

Seller documentation and community discussions refer to both a 12-month validity window and, for some categories, a 180-day window. We have not verified which one applies to a given marketplace, site, or category, and this page does not state a rule. The two figures are mentioned here only so you know to check the question rather than assume an answer.

Use the figure in your own notice and the current official page for your category and site. Do not bring a number from a forum post, a template, or this guide into a submission.

4. Common mistakes

5. Before you resubmit

If this is not the first rejection, first confirm the state of the queue: how many times was the file submitted in the last 30 days, is a case still open, and was a follow-up clicked while a review was in progress. Where the same reason keeps returning, the submission behaviour may be the actual blocker, and changing the document will not break the loop. Stop adding submissions until the current review closes, then send one complete package.

6. Where to verify

Rules and standard editions change. Content compiled 2026-11-14; re-check within 30-60 days.

Turn the wording into a checklist

Paste your notice into the free self-check tool to get a printable one-page checklist of general items to verify. It does not diagnose your case.

Open the notice self-check →
This is a free self-check aid. It matches pasted text against a compiled list of commonly seen phrases and shows general checklists. It does not determine the cause of your case, does not tell you what to submit, and is not legal, compliance, or marketplace advice. No reinstatement, first-pass approval, or processing time is promised. Rules compiled 2026-11-14; re-check within 30-60 days.